SFERASOL
THAT'S WHY INSTALLING SFERASOL MEANS MINIMAL COST COMPARED TO NORMAL FLAT PANELS.
- Install the cold water supply inlet and the outlet for the heated water in the orifice to be found on the bearing plane.
- Add an electrical supply cable.
- When positioning SFERASOL on its base it must be positioned with the hatch on the stand facing south.
- Connect the cold water to the check-valve installed on the cold water inlet circuit to the SFERASOL.
- Run cold water into the SFERASOL until it is completely full.
- Connect the hot water to the SFERASOL's heated water circuit outlet fitting.
- Connect the electrical supply.
- Once the positioning and connection are complete, uncover the SFERASOL and immediately start up the device.
DONE!!!
IN LESS THAN 2 HOURS, YOUR SFERASOL IS READY TO PRODUCE HOT WATER FOR FREE.